Users Also Read
Read MCQ's/Objective questions
MCQ's Search Engine
Airport Engineering
Applied Mechanics & Graphic Statics
Building Materials and Construction
Concrete Technology (R.C.C.)
Dock and Harbor Engineering
Environmental Engineering
Estimation Costing, Quantity Surveying
Fluid Mechanics/Hydraulic Engineering
Highways Engineering
Railway Engineering
Sanitary Engineering
Soil Mechanics and Foundation Engg
Steel Structures & it's Design
Strength of Materials
Surveying
Theory/Design of Structures Analysis
Tunnel Engineering
Water Res. Engg, Irrigation, Hydrology
Air Pollution
Home⇒ Engineering⇒
Construction planning and manag pert
1-Dont try to cram or spend more time here just read it fast and cover syllabus then practice MCQ's cheptor of same topic to check your progress. . |
2-Wrong options are also given but dont concentrate there, Right answer is in bold format. |
Q1 ⇒ Which of the following is not another name of
Hoe ? Trenching machine [other wrong options] [Discuss in forum] Backhoe Back-shovel Pull shovel |
Q2 ⇒ Which of the following is not an excavating,
equipments ? Scraper [other wrong options] [Discuss in forum] Power shovel Dragline Hoe |
Q3 ⇒ The effectiveness of explosion during tunnelling
increases by the process of Stemming [other wrong options] [Discuss in forum] Squibbing Priming Firing |
Q4 ⇒ Which of the following is not needed in a
large store ? None of these [other wrong options] [Discuss in forum] Trolley Fork lift Gravity feed system |
Q5 ⇒ Bar charts are considered suitable for Minor projects [other wrong options] [Discuss in forum] Major projects Large projects All of these |
Q6 ⇒ PERT is Event oriented [other wrong options] [Discuss in forum] Activity oriented Time oriented Resources oriented |
Q7 ⇒ In PERT technique, completion of an activity
is called Head event [other wrong options] [Discuss in forum] Head activity Tail Activity Tail event |
Q8 ⇒ Critical path Is always longest [other wrong options] [Discuss in forum] Always shortest May be longest May be shortest |
Q9 ⇒ The effect of network compression is increase
in the Direct cost [other wrong options] [Discuss in forum] Total cost Indirect cost Overheads |
Q10 ⇒ Size of a dragline is indicated by the size of Bucket [other wrong options] [Discuss in forum] Dipper Cab Boom |
Q11 ⇒ Material used for the construction of load
bearing piles is Any of these [other wrong options] [Discuss in forum] Wood Concrete Steel |
Q12 ⇒ The amount saved as depreciation reserve
fund will be termed as None of these [other wrong options] [Discuss in forum] Operating cost Profit Loss |
Q13 ⇒ PERT technique of network analysis is mainly useful for research and development projects [other wrong options] [Discuss in forum] small projects large and complex projects deterministic activities |
Q14 ⇒ Which one of the following is not the
excavating and movinig type machine ? Dump truck [other wrong options] [Discuss in forum] Dragline Scraper Buldozer |
Q15 ⇒ Select the correct statement. none of the above [other wrong options] [Discuss in forum] Activity arrows in a CPM network are drawn to scale The tail of an arrow represents the finish of an activity Arrow bead represents the start of an activity |
Q16 ⇒ A four wheel drive has Both rear as well as front differential [other wrong options] [Discuss in forum] No differential Differential on rear side only Differential on front side only |
Q17 ⇒ Which of the following is a weakness of bar chart ? all of the above [other wrong options] [Discuss in forum] interdependencies of activities project progress uncertainties |
Q18 ⇒ Gnatt chart is drawn for Resources versus progress [other wrong options] [Discuss in forum] Time versus activity Activity versus activity Progress versus time |
Q19 ⇒ In the network shown in Fig. , activity 4-5 can be started only when activity 2-4 and 2>-A both are com-pleted [other wrong options] [Discuss in forum] activity 3-4 is completed activity 2—4 is completed activity 2-3 is completed |
Q20 ⇒ Crashing is Reduction is duration [other wrong options] [Discuss in forum] Reduction of resource Reduction of cost Reduction in project size |