High load factor indicates | |
A. | cost of generation per unit power is increased [Wrong Answer] |
B. | total plant capacity is utilised for most of the time [Correct Answer] |
C. | total plant capacity is not properly utilised for most of the time [Wrong Answer] |
D. | none of the above [Wrong Answer] |