Users Also Read
Read MCQ's/Objective questions
MCQ's Search Engine
Compressors,Gas Turbine & Jet Engn
Engineering Materials
Engineering Mechanics
Heat Transfer
Internal Combustion (I.C.) Engine
Machine Design
Nuclear Power Plants
Hydraulic Machines, Fluid Mechanics
Hydraulic Machines
Fluid Mechanics
Process Instrumentation and Control
Production & Industrial Engg Mngment
Refrigeration and Air Conditioning
Steam Boiler,Engine,Nozzle & Turbine
Strength of Materials
Theory of Machines
Thermodynamics
Workshop Technology
Applied Mechanics
Automobile Engineering
General Engineering
Engineering Methodology / Meterology
Home⇒ Engineering⇒
Production technology
1-Dont try to cram or spend more time here just read it fast and cover syllabus then practice MCQ's cheptor of same topic to check your progress. . |
2-Wrong options are also given but dont concentrate there, Right answer is in bold format. |
Q1 ⇒ Work study is concerned with improving present method and finding standard time [other wrong options] [Discuss in forum] motivation of workers improving production capability improving production planning and control all of the above. |
Q2 ⇒ Basic tool in work study is stop watch [other wrong options] [Discuss in forum] graph paper process chart planning chart analytical mind. |
Q3 ⇒ What does symbol 'O' imply in work study operation [other wrong options] [Discuss in forum] inspection transport delay/temporary storage none of the above. |
Q4 ⇒ What does symbol 'D' imply in work study delay/temporary storage [other wrong options] [Discuss in forum] inspection transport permanent storage none of the above. |
Q5 ⇒ What hoes symbol' V' imply in work study permanent storage [other wrong options] [Discuss in forum] operation inspection delay/ temporary Storage none of the above. |
Q6 ⇒ Material handling in automobile industry is done by overhead crane [other wrong options] [Discuss in forum] trolley belt conveyor all of the above none of the above. |
Q7 ⇒ String diagram is used when team of workers is working at a place [other wrong options] [Discuss in forum] material handling is to be done idle time is to be reduced all of the above none of the above. |
Q8 ⇒ Work study is most useful where production activities are involved [other wrong options] [Discuss in forum] in judging the rating of machines in improving industrial relations in judging the output of a man and improving it where men are biggest contributor to success of a project. |
Q9 ⇒ Micromotion study is subdivision of an operation into therbligs and their analysis [other wrong options] [Discuss in forum] enlarged view of motion study analysis of one stage of motion study minute and detailed motion study motion study of small components upto microseconds. |
Q10 ⇒ In micromotion study, therblig is described by standard symbol and colour. [other wrong options] [Discuss in forum] a symbol an event an activity micro motions |
Q11 ⇒ The allowed time for a job equals standard time plus policy allowance [other wrong options] [Discuss in forum] interference allowance process allowance learning allowance unforeseen allowance. |
Q12 ⇒ Micromotion study involves following number of fundamental hand motions 16 [other wrong options] [Discuss in forum] 8 12 20 24 |
Q13 ⇒ The standard time for a job is total work content + delay contingency allowance [other wrong options] [Discuss in forum] total work content basic time + relaxation time total work content + basic time total work content + relaxation time. |
Q14 ⇒ Work study is done with the help of stop watch [other wrong options] [Discuss in forum] process chart material handling all of the above none of the above. |
Q15 ⇒ Scheduling gives information about when work should start and how much work should be completed during a certain period [other wrong options] [Discuss in forum] when work should complete that how idle time can be minimised prcper utilisation of machines none of the above. |
Q16 ⇒ Expediting function consists in keeping a watch on flow of material and in case of trouble locate source of trouble [other wrong options] [Discuss in forum] operator's activity minimising the delays making efficient despatching none of the above. |
Q17 ⇒ Choose the wrong statement Time study is used to determine overhead expenses [other wrong options] [Discuss in forum] provide a basis for setting piece prices or incentive wages determine standard costs determine the capability of an operator to handle the number of machines compare alternative methods. |
Q18 ⇒ Job evaluation is the method-of determining the relative worth of jobs [other wrong options] [Discuss in forum] skills required by a worker contribution of a worker contribution of a job effectiveness of various alternatives. |
Q19 ⇒ Micro motion study is analysis of a man-work method by using a motion picture camera with a timing device in the field of view [other wrong options] [Discuss in forum] motion study* observed on enhanced time intervals motion study of a sequence of operations conducted systematically study of man and machine conducted simultaneously scientific, analytical procedure for determining optimum work method. |
Q20 ⇒ Per cent idle time for men or machines is found by work sampling [other wrong options] [Discuss in forum] time study method study work study ABC analysis. |
Or |