Users Also Read
Read MCQ's/Objective questions
MCQ's Search Engine
Compressors,Gas Turbine & Jet Engn
Engineering Materials
Engineering Mechanics
Heat Transfer
Internal Combustion (I.C.) Engine
Machine Design
Nuclear Power Plants
Hydraulic Machines, Fluid Mechanics
Hydraulic Machines
Fluid Mechanics
Process Instrumentation and Control
Production Technology
Refrigeration and Air Conditioning
Steam Boiler,Engine,Nozzle & Turbine
Strength of Materials
Theory of Machines
Thermodynamics
Workshop Technology
Applied Mechanics
Automobile Engineering
General Engineering
Engineering Methodology / Meterology
Home⇒ Engineering⇒
Production industrial engineering management
1-Dont try to cram or spend more time here just read it fast and cover syllabus then practice MCQ's cheptor of same topic to check your progress. . |
2-Wrong options are also given but dont concentrate there, Right answer is in bold format. |
Q1 ⇒ Job evaluation is the method-of determining the relative worth of jobs [other wrong options] [Discuss in forum] skills required by a worker contribution of a worker contribution of a job effectiveness of various alternatives. |
Q2 ⇒ The chamfering is an essential operation after. thread cutting [other wrong options] [Discuss in forum] knurling rough turning boring |
Q3 ⇒ Micro motion study is analysis of a man-work method by using a motion picture camera with a timing device in the field of view [other wrong options] [Discuss in forum] motion study observed on enhanced time intervals motion study of a sequence of operations conducted systematically study of man and machine conducted simultaneously scientific, analytical procedure for determining optimum work method. |
Q4 ⇒ Per cent idle time for men or machines is found by work sampling [other wrong options] [Discuss in forum] time study method study work study ABC analysis. |
Q5 ⇒ TMU in method time measurement stands for time measurement unit [other wrong options] [Discuss in forum] time motion unit time movement unit technique measurement unit time method unit. |
Q6 ⇒ Time study is the appraisal, in terms of time, of the value of work involving human effort [other wrong options] [Discuss in forum] machine setting time time taken by workers to do a job method of fixing time for workers method of determining the personnel Requirement. |
Q7 ⇒ Work sampling observations are taken on the basis of table of random numbers [other wrong options] [Discuss in forum] detailed calculations convenience past experience fixed percentage of daily production. |
Q8 ⇒ One time measurement unit(TMU) in method time measurement system equals 0.0006 minute [other wrong options] [Discuss in forum] 0.0001 minute 0.006 minute 0.001 minute 0.06 minute. |
Q9 ⇒ Basic motion time study gives times for basic motions in ten thousandths of minute [other wrong options] [Discuss in forum] second hour day none of the above. |
Q10 ⇒ Choose the wrong statement. Motion study is used for reducing inventory costs. [other wrong options] [Discuss in forum] improving a work method improvising a work method designing a work method providing a schematic framework |
Q11 ⇒ Gnatt chart provides information about the production schedule [other wrong options] [Discuss in forum] material handling proper utilisation of manpower efficient working of machine all of the above. |
Q12 ⇒ ABC analysis deals with controlling inventory costs money [other wrong options] [Discuss in forum] analysis of process chart flow of material ordering schedule of job all of the above. |
Q13 ⇒ Process layout is employed for batch production [other wrong options] [Discuss in forum] continuous type of product effective utilization of machines all of the above none of the above. |
Q14 ⇒ For a product layout the material handling equipment must be designed as special purpose for a particular application [other wrong options] [Discuss in forum] have full flexibility employ conveyor belts, trucks, tractors etc. be a general purpose type arranging shops according to specialization of duties. |
Q15 ⇒ Travel charts provide a compact estimate of the handling which must be done between various work sections [other wrong options] [Discuss in forum] an idea of the flow of materials at various stages the information for changes required in rearranging material handling equipment an approximate estimate of the handling which must be done at a particular station solution to handling techniques to achieve most optimum^ results. |
Q16 ⇒ Product layout is employed for continuous production1 [other wrong options] [Discuss in forum] batch production effective utilisation of machine all of the above none of the above. |
Q17 ⇒ The process layout is best suited where few number of non-standardised units are to be produced [other wrong options] [Discuss in forum] specialisation exists machines are arranged according to sequence of operation mass production is envisaged bought out items are more. |
Q18 ⇒ A low unit cost can be obtained by following product layout [other wrong options] [Discuss in forum] functional layout automatic material handling equip¬ment specialisation of operation minimum travel time plan and compact layout. |
Q19 ⇒ Military organisation is known as line organisation [other wrong options] [Discuss in forum] line and staff organisation functional organisation all of the above none of the above. |
Q20 ⇒ The main disadvantage of line organisation is all of the above [other wrong options] [Discuss in forum] top level executives have to do exces-sive work structure is rigid communication delays occur none of the above. |