Users Also Read
Read rapid fire / short notes
MCQ's Search Engine
Airport Engineering
Applied Mechanics & Graphic Statics
Building Materials and Construction
Concrete Technology (R.C.C.)
Construction Planning & Manag., PERT
Environmental Engineering
Estimation Costing, Quantity Surveying
Fluid Mechanics/Hydraulic Engineering
Highways Engineering
Railway Engineering
Sanitary Engineering
Soil Mechanics and Foundation Engg
Steel Structures & it's Design
Strength of Materials
Surveying
Theory/Design of Structures Analysis
Tunnel Engineering
Water Res. Engg, Irrigation, Hydrology
Air Pollution
Home⇒ Engineering⇒
Dock and harbor engineering
Note:- You can add tough questions into your favourite list for second revision. |
As compared to wall type breakwater, mound type breakwater | |
A. | requires skilled labour [Wrong Answer] |
B. | requires low maintenance cost [Wrong Answer] |
C. | requires less material [Wrong Answer] |
D. | results in less damage due to gradual failure [Correct Answer] |