A mP contains 2 MHz crystal. The time taken to complete instructions with 1000 cycles is | |
A. | 2 ms [Wrong Answer] |
B. | 1 ms [Correct Answer] |
C. | 2 nx [Wrong Answer] |
D. | 1 ns [Wrong Answer] |