Users Also Read
Read MCQ's/Objective questions
MCQ's Search Engine
Airport Engineering
Applied Mechanics & Graphic Statics
Building Materials and Construction
Concrete Technology (R.C.C.)
Construction Planning & Manag., PERT
Dock and Harbor Engineering
Environmental Engineering
Fluid Mechanics/Hydraulic Engineering
Highways Engineering
Railway Engineering
Sanitary Engineering
Soil Mechanics and Foundation Engg
Steel Structures & it's Design
Strength of Materials
Surveying
Theory/Design of Structures Analysis
Tunnel Engineering
Water Res. Engg, Irrigation, Hydrology
Air Pollution
Home⇒ Engineering⇒
Estimation costing quantity surveying
1-Dont try to cram or spend more time here just read it fast and cover syllabus then practice MCQ's cheptor of same topic to check your progress. . |
2-Wrong options are also given but dont concentrate there, Right answer is in bold format. |
Q21 ⇒ Volume of sand carried in a truck is
approximately 4 cu. m. [other wrong options] [Discuss in forum] 6 cu. m. 8 cu. m. 10 cu. m. |
Q22 ⇒ One cubic metre of mild steel weighs about 7850 kg [other wrong options] [Discuss in forum] 1000 kg 3625 kg 12560 kg |
Q23 ⇒ In a galvanised corrugated iron sheet the pitch
(centre to centre distance) of corrugation is
usually 75 mm [other wrong options] [Discuss in forum] 50 mm 100 mm 150 mm |
Q24 ⇒ The unit of payment for fixing of glass panes
or cleaning is in Number [other wrong options] [Discuss in forum] Kg Sq. m. Cu. m. |
Q25 ⇒ The ratio of cost of labour to the total cost of
the building is 1 : 4 [other wrong options] [Discuss in forum] 1 : 10 1 : 1 6 : 10 |
Q26 ⇒ Number of bricks of size 20 cm x 10 cm x 10
cm required for 100 cubic metres of masonry
wall is 50000 [other wrong options] [Discuss in forum] 500 5000 500000 |
Q27 ⇒ The quantity of stone required for 10 cubic
metre of rubble stone masonry 12.5 cu. m. [other wrong options] [Discuss in forum] 10 cu. m. 8 cu. m. 13.5 cu. m. |
Q28 ⇒ Sludge from a septic tank should be removed
in 1 to 2 years [other wrong options] [Discuss in forum] 3 to 5 years 3 to 4 years Every year |
Q29 ⇒ A work costing less than Rs. 20000 is termed
as Petty work [other wrong options] [Discuss in forum] Minor work Major vork Casual work |
Q30 ⇒ The unit of measurement for concrete work in
R.C.C. is in Cu. m. [other wrong options] [Discuss in forum] Sq. m. 10 sq. m. 10 cu. m. |
Q31 ⇒ Estimate expected to be least accurate is Plinth area estimate [other wrong options] [Discuss in forum] Supplementary estimate Detailed estimate Revised estimate |
Q32 ⇒ In analysis of rates contractor profit is taken
at the rate of 0.1 [other wrong options] [Discuss in forum] 0.01 0.05 0.2 |
Q33 ⇒ The expected out turn of cement concrete
1 : 2 : 4 per mason per day is 5.0 m3 [other wrong options] [Discuss in forum] 1.5 m3 2.5 m3 3.5 m3 |
Q34 ⇒ The total estimated cost of a building electrification
usually accounts for 0.08 [other wrong options] [Discuss in forum] 0.01 0.02 0.15 |
Q35 ⇒ The number of corrugations per sheet in case
of Asbestos cement corrugated sheet is 7 [other wrong options] [Discuss in forum] 3 5 10 |
Q36 ⇒ The unit of measurement for electric wiring
or electrification light, fan, plug points is Point [other wrong options] [Discuss in forum] Metre Number No unit |
Q37 ⇒ In a detailed estimate the provision for
contingencies is usually 3 to 5% [other wrong options] [Discuss in forum] 0.01 0.1 12 to 15% |
Q38 ⇒ While mixiniz cement mortar by volume, the
volume of a cement bag is specified as 35 litres [other wrong options] [Discuss in forum] 50 litres 0.050 cu. m. 0.35 cu. m. |
Q39 ⇒ The expected out turn of 2-5 cm cement
concrete floor per mason per day 7.5 sq. m. [other wrong options] [Discuss in forum] 2.5 sq. m. 5.0 sq. m. 10 sq. m. |
Q40 ⇒ In a detailed estimate the provision for
contingencies is, usually 3% to 5% [other wrong options] [Discuss in forum] 0.01 0.1 12% to 50% |