Users Also Read
Read MCQ's/Objective questions
MCQ's Search Engine
Airport Engineering
Applied Mechanics & Graphic Statics
Building Materials and Construction
Concrete Technology (R.C.C.)
Construction Planning & Manag., PERT
Environmental Engineering
Estimation Costing, Quantity Surveying
Fluid Mechanics/Hydraulic Engineering
Highways Engineering
Railway Engineering
Sanitary Engineering
Soil Mechanics and Foundation Engg
Steel Structures & it's Design
Strength of Materials
Surveying
Theory/Design of Structures Analysis
Tunnel Engineering
Water Res. Engg, Irrigation, Hydrology
Air Pollution
Home⇒ Engineering⇒
Dock and harbor engineering
1-Dont try to cram or spend more time here just read it fast and cover syllabus then practice MCQ's cheptor of same topic to check your progress. . |
2-Wrong options are also given but dont concentrate there, Right answer is in bold format. |
Q21 ⇒ A ship strikes the berth generally at an angle 10° with the face of the dock [other wrong options] [Discuss in forum] 90° with the face of the dock 45° with the face of the dock 30° with the face of the dock |
Q22 ⇒ A ship is berthed in a chamber and lifted by principles of buoyancy Such a chamber is called. Floating dock [other wrong options] [Discuss in forum] Dry dock Wet dock Refuge dock |
Or |